New projects near Chow Kit Monorail station

8 projects are selling or upcoming within 1.5 km of Chow Kit, from RM470k. The cheapest unit at a project here has a median of RM938k, against RM914k along the KL Monorail.

Chow Kit is stop 10 of 11 on the KL Monorail, open since 2003, with platforms above the road. It is mapped as step-free.

The 8 projects within 1.5 km sit in Kampung Baru, KLCC and Sentul, listing from RM470k to RM17.81m. Completion runs from 2026 to 2032.

6 buildings have already been completed within 1.5 km, between 2022 and 2025. They are not for sale, and sit with the sold-out projects below.

The closest is Residensi Armani Kg Baru 1, about 500 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

7 sold out, completed or lapsed within 1.5 km

Chow Kit station

Station code
MR10
Service
Monorail
Opened
2003
Operator
Rapid KL
Platforms
elevated
Platform tracks
2
Step-free access
Yes
Mapped entrances
2

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

  • KL Monorail: Medan Tuanku ← Chow Kit → Titiwangsa · trains 06:00 to 23:30, every 7 to 10 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.