New projects near Titiwangsa station

4 projects are selling or upcoming within 1.5 km of Titiwangsa, from RM413k. The cheapest unit at a project here has a median of RM612k, against RM782k along the LRT Ampang line.

Titiwangsa is stop 16 of 18 on the LRT Ampang line, open since 1996, with platforms above the road. It is mapped as step-free.

The 4 projects within 1.5 km sit in Sentul, Setapak and Kampung Baru, listing from RM413k to RM4.59m. Completion runs from 2026 to 2028.

5 buildings have already been completed within 1.5 km, between 2023 and 2025. They are not for sale, and sit with the sold-out projects below.

The closest is Residensi Tun Razak 2, about 300 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

7 sold out, completed or lapsed within 1.5 km

Titiwangsa station

Station code
AG3
Services
LRT, MRT, Monorail
Opened
1996
Operator
Rapid KL
Platforms
elevated
Platform tracks
2
Step-free access
Yes
Mapped entrances
7

Along the line

  • LRT Ampang line: PWTC ← Titiwangsa → Sentul · trains 06:00 to 23:25, every 3 to 5 minutes on a weekday
  • LRT Sri Petaling line: Sentul ← Titiwangsa → PWTC · trains 06:00 to 00:00, every 3 to 5 minutes on a weekday
  • MRT Putrajaya line: Sentul Barat ← Titiwangsa → Hospital Kuala Lumpur · trains 06:00 to 00:00, every 4 to 14 minutes on a weekday
  • KL Monorail: Chow Kit ← Titiwangsa → terminus · trains 06:00 to 23:30, every 7 to 10 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.