New projects near Hospital Kuala Lumpur MRT station

5 projects are selling or upcoming within 1.5 km of Hospital Kuala Lumpur, from RM413k. The cheapest unit at a project here has a median of RM753k, against RM669k along the MRT Putrajaya line.

Hospital Kuala Lumpur is stop 17 of 36 on the MRT Putrajaya line, open since 2023, with platforms underground. It is mapped as step-free.

The 5 projects within 1.5 km sit in Kampung Baru, Sentul and Setapak, listing from RM413k to RM4.59m. Completion runs from 2026 to 2028.

2 buildings have already been completed within 1.5 km, between 2023 and 2026. They are not for sale, and sit with the sold-out projects below.

The closest is Residensi Tun Razak 2, about 400 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

2 sold out, completed or lapsed within 1.5 km

Hospital Kuala Lumpur station

Station code
PY18
Service
MRT
Opened
2023
Operator
Rapid KL
Platforms
underground
Step-free access
Yes
Mapped entrances
2
Air-conditioned
Yes

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

  • MRT Putrajaya line: Titiwangsa ← Hospital Kuala Lumpur → Raja Uda · trains 06:00 to 00:00, every 4 to 14 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.