New projects near Raja Uda MRT station

9 projects are selling or upcoming within 1.5 km of Raja Uda, from RM753k. The cheapest unit at a project here has a median of RM1.1m, against RM669k along the MRT Putrajaya line.

Raja Uda is stop 18 of 36 on the MRT Putrajaya line, open since 2023, with platforms underground. It is mapped as step-free.

The 9 projects within 1.5 km sit in Kampung Baru, KLCC and Kampung Datuk Keramat, listing from RM753k to RM17.81m. Completion runs from 2027 to 2032.

5 buildings have already been completed within 1.5 km, between 2023 and 2026. They are not for sale, and sit with the sold-out projects below.

The closest is Residensi Lofthill, about 100 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

6 sold out, completed or lapsed within 1.5 km

Raja Uda station

Station code
PY19
Service
MRT
Opened
2023
Operator
Rapid KL
Platforms
underground
Step-free access
Yes
Mapped entrances
3

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.