New projects near Medan Tuanku Monorail station

7 projects are selling or upcoming within 1.5 km of Medan Tuanku, from RM753k. The cheapest unit at a project here has a median of RM1.1m, against RM914k along the KL Monorail.

Medan Tuanku is stop 9 of 11 on the KL Monorail, open since 2003, with platforms above the road. It is mapped as step-free.

The 7 projects within 1.5 km sit in KLCC, Kampung Baru and Bukit Bintang, listing from RM753k to RM17.81m. Completion runs from 2027 to 2032.

5 buildings have already been completed within 1.5 km, between 2021 and 2025. They are not for sale, and sit with the sold-out projects below.

The closest is Residensi Armani Kg Baru 1, about 400 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

6 sold out, completed or lapsed within 1.5 km

Medan Tuanku station

Station code
MR9
Service
Monorail
Opened
2003
Operator
Rapid KL
Platforms
elevated
Platform tracks
2
Step-free access
Yes
Mapped entrances
5

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

  • KL Monorail: Bukit Nanas ← Medan Tuanku → Chow Kit · trains 06:00 to 23:30, every 7 to 10 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.