New projects near UKM KTM Komuter station

3 projects are selling or upcoming within 1.5 km of UKM, from RM300k. The cheapest unit at a project here has a median of RM435k, against RM630k along the KTM Seremban line.

UKM is stop 11 of 27 on the KTM Seremban line, open since 1995. It is mapped as step-free.

The 3 projects within 1.5 km sit in Kajang, listing from RM300k to RM548k. Completion runs from 2027 to 2029.

1 building has already been completed within 1.5 km in 2023. They are not for sale, and sit with the sold-out projects below.

The closest is Residensi Kirana, about 300 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

1 sold out, completed or lapsed within 1.5 km

UKM station

Station code
KB07
Service
KTM Komuter
Opened
1995
Operator
Keretapi Tanah Melayu
Step-free access
Yes
First and last train
06:45 to 20:19
Mapped entrances
1

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.