New projects near Kajang 2 KTM Komuter station
2 projects are selling or upcoming within 1.5 km of Kajang 2, from RM225k. The cheapest unit at a project here has a median of RM312k, against RM630k along the KTM Seremban line.
Kajang 2 is stop 12 of 27 on the KTM Seremban line, open since 2023, with platforms above the road. It is mapped as step-free.
The 2 projects within 1.5 km sit in Kajang and Bangi, listing from RM225k to RM500k. Completion runs from 2026 to 2029.
3 buildings have already been completed within 1.5 km, between 2023 and 2026. They are not for sale, and sit with the sold-out projects below.
The closest is Canopy Hills 2, about 700 m away in a straight line. A walking route will be longer.
Selling within 1.5 km
5 sold out, completed or lapsed within 1.5 km
Kajang 2 station
- Station code
- KB06A
- Service
- KTM Komuter
- Opened
- 2023
- Operator
- KTM
- Platforms
- elevated
- Step-free access
- Yes
- First and last train
- 06:48 to 20:16
- Mapped entrances
- 3
Along the line
- KTM Seremban line: UKM ← Kajang 2 → Kajang
Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.


