New projects near Bangi KTM Komuter station

1 project is selling or upcoming within 1.5 km of Bangi, from RM250k. The cheapest unit at a project here has a median of RM250k, against RM630k along the KTM Seremban line.

Bangi is stop 10 of 27 on the KTM Seremban line, open since 1902. It is mapped as step-free.

The project within 1.5 km sits in Beranang, listing from RM250k to RM295k. Completion runs to 2027.

1 building has already been completed within 1.5 km in 2024. They are not for sale, and sit with the sold-out projects below.

The closest is Idaman Bayu, about 600 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

1 sold out, completed or lapsed within 1.5 km

Bangi station

Station code
KB08
Service
KTM Komuter
Opened
1902
Operator
KTM
Platform tracks
3
Step-free access
Yes
First and last train
06:39 to 20:27
Mapped entrances
1

Along the line

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.