New projects near Semantan MRT station

7 projects are selling or upcoming within 1.5 km of Semantan, from RM770k. The cheapest unit at a project here has a median of RM5.04m, against RM861k along the MRT Kajang line.

Semantan is stop 10 of 29 on the MRT Kajang line, open since 2016, with platforms above the road. It is mapped as step-free.

The 7 projects within 1.5 km sit in Bukit Damansara, Bangsar and Taman Duta, listing from RM770k to RM37.75m. 6 are high-rise and 1 landed. Completion runs from 2025 to 2030.

1 building has already been completed within 1.5 km in 2026. They are not for sale, and sit with the sold-out projects below.

The closest is Pavilion Damansara Heights, about 500 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

2 sold out, completed or lapsed within 1.5 km

Semantan station

Station code
KG14
Service
MRT
Opened
2016
Operator
Rapid KL
Platforms
elevated
Step-free access
Yes
Mapped entrances
2

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.