New projects near Muzium Negara MRT station

4 projects are selling or upcoming within 1.5 km of Muzium Negara, from RM788k. The cheapest unit at a project here has a median of RM831k, against RM861k along the MRT Kajang line.

Muzium Negara is stop 11 of 29 on the MRT Kajang line, open since 2017, with platforms underground. It is mapped as step-free.

The 4 projects within 1.5 km sit in Bangsar, Seputeh and Brickfields, listing from RM788k to RM2.27m. Completion runs from 2027 to 2030.

2 buildings have already been completed within 1.5 km, between 2023 and 2024. They are not for sale, and sit with the sold-out projects below.

The closest is Riveria Sentral (Tower B), about 900 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

3 sold out, completed or lapsed within 1.5 km

Muzium Negara station

Station code
KG15
Service
MRT
Opened
2017
Operator
Rapid KL
Platforms
underground
Step-free access
Yes
Mapped entrances
2
Air-conditioned
Yes

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

  • MRT Kajang line: Semantan ← Muzium Negara → Pasar Seni · trains 06:00 to 00:00, every 6 to 10 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.