New projects near Kampung Batu station

3 projects are selling or upcoming within 1.5 km of Kampung Batu, from RM300k. The cheapest unit at a project here has a median of RM501k, against RM669k along the MRT Putrajaya line.

Kampung Batu is stop 12 of 36 on the MRT Putrajaya line, open since 2010, with platforms above the road. It is mapped as step-free.

The 3 projects within 1.5 km sit in Batu and Sentul, listing from RM300k to RM1.29m. Completion runs to 2029.

2 buildings have already been completed within 1.5 km, between 2024 and 2025. They are not for sale, and sit with the sold-out projects below.

The closest is Starloft Residence, about 1.0 km away in a straight line. A walking route will be longer.

Selling within 1.5 km

2 sold out, completed or lapsed within 1.5 km

Kampung Batu station

Station code
PY13
Services
MRT, KTM Komuter
Opened
2010
Operator
Rapid KL
Platforms
elevated
Step-free access
Yes
Mapped entrances
3

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.