New projects near Taman Wahyu KTM Komuter station
2 projects are selling or upcoming within 1.5 km of Taman Wahyu, from RM300k. The cheapest unit at a project here has a median of RM457k, against RM630k along the KTM Seremban line.
Taman Wahyu is stop 26 of 27 on the KTM Seremban line, open since 2010, with platforms above the road.
The 2 projects within 1.5 km sit in Batu and Sentul, listing from RM300k to RM1.56m. Completion runs to 2031.
2 buildings have already been completed within 1.5 km, between 2024 and 2025. They are not for sale, and sit with the sold-out projects below.
The closest is Residensi Hanya Wahyu (Phase 1 & 2), about 500 m away in a straight line. A walking route will be longer.
Selling within 1.5 km
2 sold out, completed or lapsed within 1.5 km
Taman Wahyu station
- Station code
- KC04
- Service
- KTM Komuter
- Opened
- 2010
- Operator
- Keretapi Tanah Melayu
- Platforms
- elevated
- First and last train
- 06:34 to 23:47
- Mapped entrances
- 3
Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.
Along the line
- KTM Seremban line: Kampung Batu ← Taman Wahyu → Batu Caves
Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.


