New projects near Batu Kentonmen KTM Komuter station

6 projects are selling or upcoming within 1.5 km of Batu Kentonmen, from RM300k. The cheapest unit at a project here has a median of RM523k, against RM630k along the KTM Seremban line.

Batu Kentonmen is stop 24 of 27 on the KTM Seremban line, open since 2010. It is mapped as step-free.

The 6 projects within 1.5 km sit in Sentul and Batu, listing from RM300k to RM1.29m. Completion runs from 2028 to 2030.

4 buildings have already been completed within 1.5 km, between 2021 and 2025. They are not for sale, and sit with the sold-out projects below.

The closest is Bamboo Hills Residences (Phase 2A), about 600 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

7 sold out, completed or lapsed within 1.5 km

Batu Kentonmen station

Station code
KC02
Service
KTM Komuter
Opened
2010
Operator
Keretapi Tanah Melayu
Platform tracks
2
Step-free access
Yes
First and last train
06:39 to 23:43
Mapped entrances
1

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.