New projects near Bandar Tun Hussein Onn MRT station

2 projects are selling or upcoming within 1.5 km of Bandar Tun Hussein Onn, from RM250k. The cheapest unit at a project here has a median of RM373k, against RM861k along the MRT Kajang line.

Bandar Tun Hussein Onn is stop 24 of 29 on the MRT Kajang line, open since 2017, with platforms above the road. It is mapped as step-free.

The 2 projects within 1.5 km sit in Cheras, listing from RM250k to RM550k. Completion runs from 2029 to 2030.

3 buildings have already been completed within 1.5 km, between 2022 and 2024. They are not for sale, and sit with the sold-out projects below.

The closest is Residensi Naluri (Phase 2), about 600 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

4 sold out, completed or lapsed within 1.5 km

Bandar Tun Hussein Onn station

Station code
KG29
Service
MRT
Opened
2017
Operator
Rapid KL
Platforms
elevated
Step-free access
Yes
Mapped entrances
2

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

  • MRT Kajang line: Sri Raya ← Bandar Tun Hussein Onn → Cheras 11 Miles · trains 06:00 to 00:00, every 6 to 10 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.