New projects near Cheras 11 Miles MRT station
2 projects are selling or upcoming within 1.5 km of Cheras 11 Miles, from RM250k. The cheapest unit at a project here has a median of RM373k, against RM861k along the MRT Kajang line.
Cheras 11 Miles is stop 25 of 29 on the MRT Kajang line, open since 2017, with platforms above the road. It is mapped as step-free.
The 2 projects within 1.5 km sit in Cheras, listing from RM250k to RM550k. Completion runs from 2029 to 2030.
5 buildings have already been completed within 1.5 km, between 2022 and 2025. They are not for sale, and sit with the sold-out projects below.
The closest is Residensi Naluri (Phase 2), about 1.3 km away in a straight line. A walking route will be longer.
Selling within 1.5 km
7 sold out, completed or lapsed within 1.5 km
Cheras 11 Miles station
- Station code
- KG30
- Service
- MRT
- Opened
- 2017
- Operator
- Rapid KL
- Platforms
- elevated
- Step-free access
- Yes
- Mapped entrances
- 2
Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.
Along the line
- MRT Kajang line: Bandar Tun Hussein Onn ← Cheras 11 Miles → Bukit Dukung · trains 06:00 to 00:00, every 6 to 10 minutes on a weekday
Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.





