New projects near Sri Raya MRT station
3 projects are selling or upcoming within 1.5 km of Sri Raya, from RM220k. The cheapest unit at a project here has a median of RM250k, against RM861k along the MRT Kajang line.
Sri Raya is stop 23 of 29 on the MRT Kajang line, open since 2017, with platforms above the road. It is mapped as step-free.
The 3 projects within 1.5 km sit in Cheras, listing from RM220k to RM1.18m. Completion runs from 2029 to 2030.
2 buildings have already been completed within 1.5 km, between 2024 and 2025. They are not for sale, and sit with the sold-out projects below.
The closest is Zeya Residences, about 1.2 km away in a straight line. A walking route will be longer.
Selling within 1.5 km
Zeya Residences
Cheras, Selangor
Condominium or apartment · 3 to 5 beds · Ready 2029
RM220k to RM1.18m
115 of 150 units left
1.2 km from Sri Raya
2 sold out, completed or lapsed within 1.5 km
Sri Raya station
- Station code
- KG28
- Service
- MRT
- Opened
- 2017
- Operator
- Rapid KL
- Platforms
- elevated
- Step-free access
- Yes
- Mapped entrances
- 3
Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.
Along the line
- MRT Kajang line: Taman Suntex ← Sri Raya → Bandar Tun Hussein Onn · trains 06:00 to 00:00, every 6 to 10 minutes on a weekday
Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.




