New projects near Tiroi KTM Komuter station

2 projects are selling or upcoming within 1.5 km of Tiroi, from RM1.04m. The cheapest unit at a project here has a median of RM1.09m, against RM630k along the KTM Seremban line.

Tiroi is stop 6 of 27 on the KTM Seremban line, open since 1903. It is mapped as step-free.

The 2 projects within 1.5 km sit in Seremban, listing from RM1.04m to RM1.66m. All of them are landed. Completion runs to 2027.

1 building has already been completed within 1.5 km in 2025. They are not for sale, and sit with the sold-out projects below.

The closest is Batiq @ S2 Heights Aman - Phase 1 (Phase 1), about 500 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

1 sold out, completed or lapsed within 1.5 km

Tiroi station

Station code
KB12
Service
KTM Komuter
Opened
1903
Operator
Keretapi Tanah Melayu
Step-free access
Yes
First and last train
06:04 to 20:59

Along the line

  • KTM Seremban line: Seremban ← Tiroi → Labu

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.