New projects near Seremban KTM Komuter station

3 projects are selling or upcoming within 1.5 km of Seremban, from RM304k. The cheapest unit at a project here has a median of RM1.18m, against RM630k along the KTM Seremban line.

Seremban is stop 5 of 27 on the KTM Seremban line, open since 1910. It is mapped as step-free.

The 3 projects within 1.5 km sit in Seremban, listing from RM304k to RM3.69m. 1 is high-rise and 2 landed. Completion runs from 2027 to 2028.

The closest is Taman Seremban Heights (Phase 1), about 700 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

Seremban station

Station code
KB13
Service
KTM Komuter
Opened
1910
Operator
Keretapi Tanah Melayu
Step-free access
Yes
First and last train
05:56 to 21:07
Mapped entrances
1

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

  • KTM Seremban line: Senawang ← Seremban → Tiroi

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.