New projects near Taman Melati LRT station

4 projects are selling or upcoming within 1.5 km of Taman Melati, from RM300k. The cheapest unit at a project here has a median of RM897k, against RM723k along the LRT Kelana Jaya line.

Taman Melati is stop 2 of 37 on the LRT Kelana Jaya line, open since 1999, with platforms above the road. It is mapped as step-free.

The 4 projects within 1.5 km sit in KL Timur, Gombak Setia and Setapak, listing from RM300k to RM3.76m. 3 are high-rise and 1 landed. Completion runs from 2029 to 2030.

1 building has already been completed within 1.5 km in 2024. They are not for sale, and sit with the sold-out projects below.

The closest is Residensi Ara Melati, about 600 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

3 sold out, completed or lapsed within 1.5 km

Taman Melati station

Station code
KJ2
Service
LRT
Opened
1999
Operator
Rapid KL
Platforms
elevated
Step-free access
Yes
Mapped entrances
2

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

  • LRT Kelana Jaya line: Gombak ← Taman Melati → Wangsa Maju · trains 06:00 to 23:15, every 4 to 7 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.