New projects near Kampung Baru LRT station

12 projects are selling or upcoming within 1.5 km of Kampung Baru, from RM753k. The cheapest unit at a project here has a median of RM1.04m, against RM723k along the LRT Kelana Jaya line.

Kampung Baru is stop 11 of 37 on the LRT Kelana Jaya line, open since 1999. It is mapped as step-free.

The 12 projects within 1.5 km sit in Kampung Baru, KLCC, Bukit Bintang and Kampung Datuk Keramat, listing from RM753k to RM17.81m. Completion runs from 2027 to 2032.

9 buildings have already been completed within 1.5 km, between 2021 and 2026. They are not for sale, and sit with the sold-out projects below.

The closest is Residensi Armani Hallson Klcc, about 300 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

11 sold out, completed or lapsed within 1.5 km

Kampung Baru station

Station code
KJ11
Service
LRT
Opened
1999
Operator
Rapid KL
Step-free access
Yes
Mapped entrances
2
Air-conditioned
Yes

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

  • LRT Kelana Jaya line: KLCC ← Kampung Baru → Dang Wangi · trains 06:00 to 23:15, every 4 to 7 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.