New projects near Awan Besar LRT station

5 projects are selling or upcoming within 1.5 km of Awan Besar, from RM499k. The cheapest unit at a project here has a median of RM745k, against RM599k along the LRT Sri Petaling line.

Awan Besar is stop 19 of 29 on the LRT Sri Petaling line, open since 2015, with platforms above the road. It is mapped as step-free.

The 5 projects within 1.5 km sit in Bukit Jalil and Jalan Klang Lama (Old Klang Road), listing from RM499k to RM1.44m. Completion runs from 2028 to 2030.

6 buildings have already been completed within 1.5 km, between 2024 and 2025. They are not for sale, and sit with the sold-out projects below.

The closest is The Kingswoodz @ Bukit Jalil, about 400 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

9 sold out, completed or lapsed within 1.5 km

Awan Besar station

Station code
SP19
Service
LRT
Opened
2015
Operator
Rapid KL
Platforms
elevated
Step-free access
Yes
Mapped entrances
1

Along the line

  • LRT Sri Petaling line: Sri Petaling ← Awan Besar → Muhibbah · trains 06:00 to 00:00, every 3 to 5 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.