Taman Daya (Phase 8A)
Tebrau, Johorby Keck Seng (Malaysia) Berhad
Semi-detached, Cluster house in Tebrau, Johor
- 106Units
- 4 to 5Bedrooms
- 4 to 5Bathrooms
- 2,114 to 2,950Sq ft
- 2026Ready
Units available
29 of 106 units still available.
Licensed project
Sales permit 2823-45/02-2027/0112(R)-(L)
Key dates
- Launched (first sale signed)
- 28 Feb 2024
- Sales permit issued
- 6 Feb 2026
- Handover promised in SPA
- 28 Feb 2026
Location
- 0.5 km to SK Taman Daya 3
- 0.5 km to Austin Heights Golf & Hotel Resort
- 1.5 km to Austin Heights Water & Adventure Park
- 2.5 km to Econsave Taman Daya
- 4 km to Hospital Tebrau
- 4 km to Pasir Gudang Highway
- 4.5 km to Hospital Sultan Ismail
- 5.5 km to AEON Mall Tebrau City
- 5.5 km to IKEA Tebrau
Why consider Taman Daya (Phase 8A)
- Freehold tenure
- SK Taman Daya 3 primary school 0.5 km away
- Hospital Tebrau 4 km away and Hospital Sultan Ismail 4.5 km away
- Built-up sizes from 2,114 to 2,950 sq ft across four layouts
About this property
Two-storey cluster and semi-detached houses in Taman Daya, Tebrau, Johor
Greenwoods Residence Phase 8A is a 106-unit development in Taman Daya, Tebrau, Johor Bahru, located off Jalan Sagu 36 in the middle of the township. It is developed by Keck Seng (Malaysia) Berhad.
The phase offers four layouts: one 5-bedroom type and three 4-bedroom types, with built-up areas from 2,114 to 2,950 sq ft. Land plots range from 32 x 65 ft to 50 x 70 ft. The houses are two storeys and the project is due for completion in 2026.
The phase lies next to Austin Heights Golf & Hotel Resort and is within a few kilometres of schools, hospitals and shopping malls in Tebrau.
Unit types
RM1.04m to RM1.26m across all types
- 5 bed
- 5 bath
- 2,950 sq ft
Price check
Listed at about RM499 per sq ft, 17% below the median of RM598 psf for 13 semi-detached homes and bungalows launched since 2021 in Tebrau.
Listed at about RM472 per sq ft, 9% below the median of RM517 psf for 24 terrace, townhouse and cluster homes of a similar size launched since 2021 in Tebrau.
See the nearby launches. This compares listed prices; it is not a valuation.
Project records
- Developer
- Keck Seng (Malaysia) Berhad
- Status
- Completed (CCC)
- Construction progress
- 100%
- Sales permit
- 2823-45/02-2027/0112(R)-(L)
Updated 1 Nov 2026.
More from Keck Seng (Malaysia) Berhad
6 other projects for sale or launching soon
Greenwoods Residence @ Taman Daya
Johor Bahru, Johor
Mixed development · Freehold · 4 to 5 beds · Ready 2025
RM1.33m to RM1.46m
423 of 852 units left
Launched 3 Jun 2025
Tanjung Puteri Resort (Phase 7C)
Pasir Gudang, Johor
Terrace house · 3 bed · Ready 2027
RM508k to RM868k
21 of 53 units left
Launched 11 Aug 2025
Tanjung Puteri Resort (Phase 4F2)
Pasir Gudang, Johor
Terrace house · 4 bed · Ready 2027
RM584k to RM758k
15 of 53 units left
Launched 29 May 2025
Bandar Baru Kangkar Pulai
Kulai, Johor
Terrace house · 4 bed · Ready 2027
RM609k to RM629k
43 of 92 units left
Launched 4 Mar 2025
Nearby projects
Within 3 km
Taman Daya (Phase 8B)
Tebrau, Johor
Semi-detached, Cluster house · 4 bed · Ready 2026
RM1.06m to RM2.32m
36 of 86 units left
Launched 17 Dec 2024
Greenwoods Residence @ Taman Daya
Johor Bahru, Johor
Mixed development · Freehold · 4 to 5 beds · Ready 2025
RM1.33m to RM1.46m
423 of 852 units left
Launched 3 Jun 2025
The Ridge @ Austin Heights, Taman Mount Austin
Tebrau, Johor
Terrace house · 4 to 5 beds
RM1.19m to RM2.51m
275 units, sales just opened
Perjiranan 13 (Sanubari) (Phase 4B)
Tebrau, Johor
Terrace house · 4 bed
RM1.23m to RM1.78m
117 units, sales just opened






