Bandar Baru Kangkar Pulai
Kulai, Johorby Keck Seng (Malaysia) Berhad
Terrace house in Kulai, Johor
- 92Units
- 4Bedrooms
- 3Bathrooms
- 1,828Sq ft
- 2027Ready
Units available
43 of 92 units still available.
Licensed project
Sales permit 2823-48/01-2027/0064(N)-(L)
Key dates
- Launched (first sale signed)
- 4 Mar 2025
- Sales permit issued
- 23 Jan 2025
- Handover promised in SPA
- 4 Mar 2027
Location
- 4km to Econsave Hypermarket
- 7.7km to Universiti Teknologi Malaysia (UTM)
- 8.5km to AEON Mall Taman Universiti
- 10km to Johor Premium Outlet
- 14km to Senai International Airport
- 34.8km to Tuas/Singapore CIQ Checkpoint via 2nd Link Expressway
Why consider Bandar Baru Kangkar Pulai
- Located close to the 2nd Link Expressway, with the Tuas/Singapore CIQ checkpoint 34.8km away
- Econsave Hypermarket is 4km away and AEON Mall Taman Universiti is 8.5km away
- Universiti Teknologi Malaysia (UTM) is 7.7km away and Senai International Airport is 14km away
- Each house has 1,828 sq ft built-up on 20 x 70 ft of land, with 4 bedrooms and 3 bathrooms
About this property
Two-storey terrace houses in Bandar Baru Kangkar Pulai, Kulai, Johor
Bandar Baru Kangkar Pulai is a development of two-storey terrace houses in Kulai, Johor, built by Keck Seng (Malaysia) Berhad. The project has 92 units in total.
Each house has 1,828 sq ft of built-up area on land measuring 20 x 70 ft, with 4 bedrooms and 3 bathrooms. Tenure is leasehold for 99 years. Completion is expected in 2027.
The project is within reach of the new 2nd Interchange at Pulai Jaya and the 2nd Link Expressway to Singapore, and is close to Johor Bahru's hilltop nature park.
Unit types
RM608,800 to RM882,300
- 4 bed
- 3 bath
- 1,828 sq ft
- From RM333 psf
43 of 92 units left. List prices rise with the floor.
Floor plan not available yet
Ask for the floor planPrice check
Listed at about RM333 per sq ft, 31% below the median of RM484 psf for 9 terrace, townhouse and cluster homes of a similar size launched since 2021 in Kulai.
See the nearby launches. This compares listed prices; it is not a valuation.
Project records
- Developer
- Keck Seng (Malaysia) Berhad
- Status
- Under construction
- Construction progress
- 98%
- Sales permit
- 2823-48/01-2027/0064(N)-(L)
Updated 1 Nov 2026.
More from Keck Seng (Malaysia) Berhad
6 other projects for sale or launching soon
Greenwoods Residence @ Taman Daya
Johor Bahru, Johor
Mixed development · Freehold · 4 to 5 beds · Ready 2025
RM1.33m to RM1.46m
423 of 852 units left
Launched 3 Jun 2025
Tanjung Puteri Resort (Phase 7C)
Pasir Gudang, Johor
Terrace house · 3 bed · Ready 2027
RM508k to RM868k
21 of 53 units left
Launched 11 Aug 2025
Tanjung Puteri Resort (Phase 4F2)
Pasir Gudang, Johor
Terrace house · 4 bed · Ready 2027
RM584k to RM758k
15 of 53 units left
Launched 29 May 2025
Bandar Baru Kangkar Pulai (Phase 8C)
Kulai, Johor
Cluster house · 4 bed · Ready 2027
RM715k to RM783k
44 of 112 units left
Launched 6 Jan 2025
Nearby projects
Within 3 km
Bandar Baru Kangkar Pulai (Phase 8C)
Kulai, Johor
Cluster house · 4 bed · Ready 2027
RM715k to RM783k
44 of 112 units left
Launched 6 Jan 2025
Rb Pulai Emas - Ptd 114964, Ptd 114965, Ptd 114966, Ptd 114967, Ptd 114968, Ptd 114969, Ptd 114970, Ptd 114971, Ptd 114972, Ptd 114973 (Phase 12)
Kulai, Johor
Townhouse · 3 bed · Ready 2026
RM150k to RM210k
14 of 276 units left
Launched 9 Oct 2023




