All projectsUnits available

Queens Residences Q3 (Phase 3)

Bayan Indah, George Town, Penangby Ideal Gim Venture Sdn Bhd

Queens Residences Q3 (Phase 3)

Condominium or apartment in George Town, Penang

  • 532Units
  • 2 to 3Bedrooms
  • 2Bathrooms
  • 1,000 to 1,400Sq ft
  • 2028Ready

Behind schedule

216 of 532 units still available.

Licensed project

Sales permit 19262-4/07-2027/0609(A)-(S)

Key dates

Launched (first sale signed)
1 Aug 2024
Sales permit issued
4 Jul 2024
Handover promised in SPA
1 Aug 2027
Handover after approved extension
1 Aug 2028 (extended by 12 months)

Location

  • 100m to Queensbay Mall
  • 1.4km to Sg. Nibong Bus Terminal
  • 3km to Penang Bridge
  • 8km to Penang Second Bridge
  • 9km to Penang International Airport
  • 2km to Bukit Jambul Complex
  • 3.1km to Giant Hypermarket
  • 3.5km to Pantai Hospital Penang
  • 1.5km to SJKC Kwang Hwa

Why consider Queens Residences Q3 (Phase 3)

  • Queensbay Mall is 100m away
  • Sg. Nibong Bus Terminal is 1.4km away and Penang Bridge is 3km away
  • Freehold tenure
  • 532 units across 25 storeys

About this property

Waterfront condominium of 25 storeys in George Town, Penang

Queens Residences Q3 is a 25-storey condominium on the waterfront in George Town, Penang, and is Phase 3 of Queens Waterfront. The tenure is freehold.

The project is developed by Ideal Gim Venture Sdn Bhd and has 532 units. There are three layout types, all with three bedrooms and two bathrooms, ranging from 1000 to 1400 sq ft.

Within the wider Queens Waterfront development are a sports complex, a hotel and a medical centre, with Queensbay Mall next door.

Unit types

RM1,050,000 to RM1,529,100

  • 2 bed
  • 2 bath

59 of 152 units left. List prices rise with the floor.

Type A floor plan, Queens Residences Q3 (Phase 3)

Price check

Listed at about RM1,931 per sq ft, the highest of 17 condos and serviced residences of a similar size launched since 2021 in George Town; the next highest lists at RM1,554 psf and the median at RM578 psf.

See the nearby launches. This compares listed prices; it is not a valuation.

Project records

Developer
Ideal Gim Venture Sdn Bhd
Status
Under construction, behind schedule
Construction progress
32%
Sales permit
19262-4/07-2027/0609(A)-(S)

Updated 1 Nov 2026.

RM1.1m to RM3.13mQueens Residences Q3 (Phase 3)

Nearby projects

Within 3 km