Gerbang Nusajaya (Phase 3B)
Iskandar Puteri, Johorby Nusajaya Rise Sdn Bhd
Terrace house in Iskandar Puteri, Johor
- 77Units
- 4Bedrooms
- 3 to 4Bathrooms
- 1,743 to 2,146Sq ft
- 2027Ready
Units available
22 of 77 units still available.
Licensed project
Sales permit 14228-15/10-2027/0895(N)-(L)
Key dates
- Launched (first sale signed)
- 20 Dec 2025
- Sales permit issued
- 28 Oct 2025
- Handover promised in SPA
- 20 Dec 2027
Location
- EduCity, 5 km
- Sultan Abu Bakar CIQ Complex, 5 km
- Legoland, 10 km
- Puteri Harbour International Ferry Terminal, 10 km
- Columbia Asia Hospital, 10 km
- AEON Bukit Indah, 15 km
- Lotus Bukit Indah, 15 km
- Senai International Airport, 20 km
- Johor Premium Outlet, 20 km
Why consider Gerbang Nusajaya (Phase 3B)
- Freehold title
- Sultan Abu Bakar CIQ Complex and EduCity, both within 5 km
- Located near main highways
- Every layout has 4 bedrooms, with built-up sizes from 1,743 to 2,146 sq ft
- Community park on site with a playground, football field and jogging track
About this property
Two-storey freehold terrace houses in Gerbang Nusajaya Phase 3B, Iskandar Puteri
Gerbang Nusajaya Phase 3B is a development of two-storey terrace houses in Iskandar Puteri, Johor. Nusajaya Rise Sdn Bhd is the developer, and the phase is part of the Aspira Hills township.
The phase has 77 units across Type A and Type B designs in 20 ft and 22 ft wide lots, with six layouts in total. Each house has four bedrooms. Built-up sizes range from 1,743 to 2,146 sq ft. The land is freehold and completion is due in 2027.
Residents have access to a playground, football field, jogging track, pocket park and linear park within the Aspira Hills township.
Unit types
RM1.09m to RM1.5m across all types
- 4 bed
- 3 bath
- 1,808 sq ft
Floor plan not available yet
Ask for the floor planPrice check
Listed at about RM682 per sq ft, 23% above the median of RM554 psf for 35 terrace, townhouse and cluster homes of a similar size launched since 2021 in Iskandar Puteri.
See the nearby launches. This compares listed prices; it is not a valuation.
Common facilities
Facilities
- Playground
- Football field
- Jogging track
- Pocket park
- Linear park
Project records
- Developer
- Nusajaya Rise Sdn Bhd
- Status
- Under construction
- Construction progress
- 45%
- Sales permit
- 14228-15/10-2027/0895(N)-(L)
Updated 1 Nov 2026.
More from Nusajaya Rise Sdn Bhd
8 other projects for sale or launching soon
Gerbang Nusajaya (Phase 4)
Iskandar Puteri, Johor
Terrace house · 4 bed · Ready 2027
RM1.11m to RM1.22m
11 of 47 units left
Launched 26 Dec 2025
Gerbang Nusajaya (Phase 3A)
Iskandar Puteri, Johor
Terrace house · 4 bed · Ready 2027
RM1.06m to RM1.18m
16 of 132 units left
Launched 30 Jul 2025
Gerbang Nusajaya (Phase 2A)
Iskandar Puteri, Johor
Terrace house · 4 bed · Ready 2027
RM1.05m to RM1.25m
15 of 192 units left
Launched 27 Jul 2025
Gerbang Nusajaya (Phase 1A)
Iskandar Puteri, Johor
Terrace house · 3 to 4 beds · Ready 2026
From RM680k
1 of 142 units left
Launched 13 Oct 2024
Nearby projects
Within 3 km
Gerbang Nusajaya (Phase 4)
Iskandar Puteri, Johor
Terrace house · 4 bed · Ready 2027
RM1.11m to RM1.22m
11 of 47 units left
Launched 26 Dec 2025
Gerbang Nusajaya (Phase 3A)
Iskandar Puteri, Johor
Terrace house · 4 bed · Ready 2027
RM1.06m to RM1.18m
16 of 132 units left
Launched 30 Jul 2025
Gerbang Nusajaya (Phase 2A)
Iskandar Puteri, Johor
Terrace house · 4 bed · Ready 2027
RM1.05m to RM1.25m
15 of 192 units left
Launched 27 Jul 2025
Gerbang Nusajaya (Phase 1A)
Iskandar Puteri, Johor
Terrace house · 3 to 4 beds · Ready 2026
From RM680k
1 of 142 units left
Launched 13 Oct 2024



