All projectsUnits available

Gerbang Nusajaya (Phase 1A)

Iskandar Puteri, Johorby Nusajaya Rise Sdn Bhd

Gerbang Nusajaya (Phase 1A)

Terrace house in Iskandar Puteri, Johor

  • 142Units
  • 4Bedrooms
  • 3Bathrooms
  • 1,673 to 1,694Sq ft
  • 2026Ready

Units available

1 of 142 units still available.

Licensed project

Sales permit 14228-10/08-2027/0726(R)-(L)

Key dates

Launched (first sale signed)
13 Oct 2024
Sales permit issued
22 Aug 2026
Handover promised in SPA
13 Oct 2026

Location

  • 0.3KM Tadika Al-Ummah, Aspira Square
  • 3.3KM SK Ladang Pendas
  • 4.6KM 68° Avenue
  • 8.2KM LEGOLAND Malaysia
  • 8.3KM Hospital Gleneagles Medini
  • 9.0KM Mall of Medini
  • 11.7KM Horizon Hills Golf & Country Club

Why consider Gerbang Nusajaya (Phase 1A)

  • Freehold land title
  • Tadika Al-Ummah kindergarten is 0.3KM away at Aspira Square
  • Close to the main highway, with Gerbang Nusajaya Interchange nearby
  • Football field, jogging track, children's playground and linear park inside the estate

About this property

Two-storey terrace houses in Gerbang Nusajaya, Iskandar Puteri, Johor

Aspira Hills Phase 1A is a freehold terrace house project in the Gerbang Nusajaya area of Iskandar Puteri, Johor. It is developed by Nusajaya Rise Sdn Bhd, part of the RISE series by UEM Sunrise, with completion expected in 2026.

The phase has 142 two-storey terrace units in Type A and Type B layouts. Each unit sits on a 20 ft by 65 ft plot and has four bedrooms and three bathrooms. Built-up areas range from 1,673 to 1,694 sq ft.

The estate includes a children's playground, a football field, a jogging track and a linear park.

Unit types

RM680k across all types

  • 4 bed
  • 3 bath
  • 1,694 sq ft

Floor plan not available yet

Ask for the floor plan

Price check

Listed at about RM458 per sq ft, 7% below the median of RM492 psf for 19 terrace, townhouse and cluster homes of a similar size launched since 2021 in Iskandar Puteri.

See the nearby launches. This compares listed prices; it is not a valuation.

Common facilities

Facilities

  • Children's playground
  • Football field
  • Jogging track
  • Linear park

Project records

Developer
Nusajaya Rise Sdn Bhd
Status
Completed (CCC)
Construction progress
100%
Sales permit
14228-10/08-2027/0726(R)-(L)

Updated 1 Nov 2026.

From RM680kGerbang Nusajaya (Phase 1A)

More from Nusajaya Rise Sdn Bhd

8 other projects for sale or launching soon

See all

Nearby projects

Within 3 km