New projects near Tun Razak Exchange MRT station

8 projects are selling or upcoming within 1.5 km of Tun Razak Exchange, from RM524k. The cheapest unit at a project here has a median of RM963k, against RM861k along the MRT Kajang line.

Tun Razak Exchange is stop 15 of 29 on the MRT Kajang line, open since 2017, with platforms underground. It is mapped as step-free.

The 8 projects within 1.5 km sit in Bukit Bintang, Maluri, TRX and Pudu, listing from RM524k to RM9.47m. Completion runs from 2027 to 2031.

11 buildings have already been completed within 1.5 km, between 2022 and 2026. They are not for sale, and sit with the sold-out projects below.

The closest is Menara Golden Eagle, about 100 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

16 sold out, completed or lapsed within 1.5 km

Tun Razak Exchange station

Station code
PY23
Service
MRT
Opened
2017
Operator
Rapid KL
Platforms
underground
Step-free access
Yes
Mapped entrances
2
Air-conditioned
Yes

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

  • MRT Kajang line: Bukit Bintang ← Tun Razak Exchange → Cochrane · trains 06:00 to 00:00, every 6 to 10 minutes on a weekday
  • MRT Putrajaya line: Conlay ← Tun Razak Exchange → Chan Sow Lin · trains 06:00 to 00:00, every 4 to 14 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.