New projects near Taman Connaught MRT station

3 projects are selling or upcoming within 1.5 km of Taman Connaught, from RM380k. The cheapest unit at a project here has a median of RM567k, against RM861k along the MRT Kajang line.

Taman Connaught is stop 21 of 29 on the MRT Kajang line, open since 2017, with platforms above the road. It is mapped as step-free.

The 3 projects within 1.5 km sit in Cheras, listing from RM380k to RM2.02m. 2 are high-rise and 1 landed. Completion runs from 2026 to 2027.

1 building has already been completed within 1.5 km in 2024. They are not for sale, and sit with the sold-out projects below.

The closest is The Connaught One, about 200 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

2 sold out, completed or lapsed within 1.5 km

Taman Connaught station

Station code
KG26
Service
MRT
Opened
2017
Operator
Rapid KL
Platforms
elevated
Step-free access
Yes
Mapped entrances
4

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

  • MRT Kajang line: Taman Mutiara ← Taman Connaught → Taman Suntex · trains 06:00 to 00:00, every 6 to 10 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.