New projects near Sungai Gadut KTM Komuter station
2 projects are selling or upcoming within 1.5 km of Sungai Gadut, from RM450k. The cheapest unit at a project here has a median of RM709k, against RM630k along the KTM Seremban line.
Sungai Gadut is stop 3 of 27 on the KTM Seremban line, open since 2011. It is mapped as step-free.
The 2 projects within 1.5 km sit in Seremban, listing from RM450k to RM1.04m. All of them are landed. Completion runs from 2026 to 2028.
1 building has already been completed within 1.5 km in 2021. They are not for sale, and sit with the sold-out projects below.
The closest is Vila Bukit Negeri (Phase 2f & Fasa 2g), about 700 m away in a straight line. A walking route will be longer.
Selling within 1.5 km
1 sold out, completed or lapsed within 1.5 km
Sungai Gadut station
- Station code
- KB15
- Service
- KTM Komuter
- Opened
- 2011
- Operator
- KTM
- Step-free access
- Yes
- First and last train
- 05:45 to 21:28
- Mapped entrances
- 1
Along the line
- KTM Seremban line: Rembau ← Sungai Gadut → Senawang
Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.


