New projects near Setiawangsa LRT station

4 projects are selling or upcoming within 1.5 km of Setiawangsa, from RM230k. The cheapest unit at a project here has a median of RM496k, against RM723k along the LRT Kelana Jaya line.

Setiawangsa is stop 5 of 37 on the LRT Kelana Jaya line, open since 1999, with platforms above the road. It is mapped as step-free.

The 4 projects within 1.5 km sit in Ampang Jaya, Setapak and Taman Seri Keramat, listing from RM230k to RM1.47m. Completion runs from 2027 to 2028.

4 buildings have already been completed within 1.5 km, between 2020 and 2026. They are not for sale, and sit with the sold-out projects below.

The closest is Astrum Ampang (Phase 3), about 800 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

4 sold out, completed or lapsed within 1.5 km

Setiawangsa station

Station code
KJ5
Service
LRT
Opened
1999
Operator
Rapid KL
Platforms
elevated
Step-free access
Yes
Mapped entrances
3

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

  • LRT Kelana Jaya line: Sri Rampai ← Setiawangsa → Jelatek · trains 06:00 to 23:15, every 4 to 7 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.