New projects near Segambut KTM Komuter station

10 projects are selling or upcoming within 1.5 km of Segambut, from RM300k. The cheapest unit at a project here has a median of RM790k, against RM699k along the KTM Port Klang line.

Segambut is stop 24 of 34 on the KTM Port Klang line, open since 1892, with platforms above the road. It is mapped as step-free.

The 10 projects within 1.5 km sit in Segambut, Mont Kiara and Kepong, listing from RM300k to RM2.7m. Completion runs from 2026 to 2031.

4 buildings have already been completed within 1.5 km, between 2022 and 2025. They are not for sale, and sit with the sold-out projects below.

The closest is Stellaris @ Riana Dutamas, about 100 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

6 sold out, completed or lapsed within 1.5 km

Segambut station

Station code
KA06
Service
KTM Komuter
Opened
1892
Operator
KTM
Platforms
elevated
Platform tracks
2
Step-free access
Yes
First and last train
06:25 to 23:25

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.