New projects near Salak Tinggi KLIA Transit station

5 projects are selling or upcoming within 1.5 km of Salak Tinggi, from RM250k. The cheapest unit at a project here has a median of RM587k, against RM608k along the KLIA Transit.

Salak Tinggi is stop 3 of 6 on the KLIA Transit, open since 2002. It is mapped as step-free.

The 5 projects within 1.5 km sit in Sepang, listing from RM250k to RM1.01m. 1 is high-rise and 4 landed. Completion runs from 2027 to 2030.

3 buildings have already been completed within 1.5 km, between 2023 and 2024. They are not for sale, and sit with the sold-out projects below.

The closest is Taman Dahlia, about 800 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

3 sold out, completed or lapsed within 1.5 km

Salak Tinggi station

Service
KLIA Transit
Opened
2002
Operator
ERL
Step-free access
Yes

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.