New projects near Pulau Sebang/Tampin KTM Komuter station
2 projects are selling or upcoming within 1.5 km of Pulau Sebang/Tampin, from RM490k. The cheapest unit at a project here has a median of RM490k, against RM630k along the KTM Seremban line.
Pulau Sebang/Tampin is stop 1 of 27 on the KTM Seremban line, open since 1905. It is mapped as step-free.
The 2 projects within 1.5 km sit in Pulau Sebang, listing from RM490k to RM490k. All of them are landed. Completion runs to 2027.
3 buildings have already been completed within 1.5 km, between 2015 and 2026. They are not for sale, and sit with the sold-out projects below.
The closest is Bandar Satelit Sebang (Phase 8B), about 1.2 km away in a straight line. A walking route will be longer.
Selling within 1.5 km
4 sold out, completed or lapsed within 1.5 km
Pulau Sebang/Tampin station
- Station code
- KB17
- Service
- KTM Komuter
- Opened
- 1905
- Operator
- KTM
- Step-free access
- Yes
- First and last train
- 05:15 to 21:58
- Mapped entrances
- 1
Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.
Along the line
- KTM Seremban line: terminus ← Pulau Sebang/Tampin → Rembau
Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.



