New projects near Merdeka MRT station
4 projects are selling or upcoming within 1.5 km of Merdeka, from RM524k. The cheapest unit at a project here has a median of RM912k, against RM861k along the MRT Kajang line.
Merdeka is stop 13 of 29 on the MRT Kajang line, open since 2017, with platforms underground.
The 4 projects within 1.5 km sit in Bukit Bintang and Pudu, listing from RM524k to RM2.65m. Completion runs from 2027 to 2030.
8 buildings have already been completed within 1.5 km, between 2021 and 2026. They are not for sale, and sit with the sold-out projects below.
The closest is Astoria Ceylon, about 900 m away in a straight line. A walking route will be longer.
Selling within 1.5 km
Astoria Ceylon
Bukit Bintang, Kuala Lumpur
Serviced residence · Freehold · 1 to 3 beds · Ready 2030
RM1.13m to RM1.97m
528 units, sales just opened
900 m from Merdeka
10 sold out, completed or lapsed within 1.5 km
Merdeka station
- Station code
- KG17
- Service
- MRT
- Opened
- 2017
- Operator
- Rapid KL
- Platforms
- underground
- Step-free access
- Yes
- Mapped entrances
- 2
Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.
Along the line
- MRT Kajang line: Pasar Seni ← Merdeka → Bukit Bintang · trains 06:00 to 00:00, every 6 to 10 minutes on a weekday
Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.







