New projects near Maluri station

7 projects are selling or upcoming within 1.5 km of Maluri, from RM565k. The cheapest unit at a project here has a median of RM782k.

Maluri is stop 6 of 18 on the LRT Ampang line, open since 1996. It is mapped as step-free.

The 7 projects within 1.5 km sit in Maluri and Cheras, listing from RM565k to RM2.11m. Completion runs from 2028 to 2031.

5 buildings have already been completed within 1.5 km, between 2021 and 2025. They are not for sale, and sit with the sold-out projects below.

The closest is Residensi Alderwood, about 400 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

7 sold out, completed or lapsed within 1.5 km

Maluri station

Station code
AG13
Services
LRT, MRT
Opened
1996
Operator
Rapid KL
Step-free access
Yes
Mapped entrances
6

Along the line

  • LRT Ampang line: Pandan Jaya ← Maluri → Miharja · trains 06:00 to 23:25, every 3 to 5 minutes on a weekday
  • MRT Kajang line: Cochrane ← Maluri → Taman Pertama · trains 06:00 to 00:00, every 6 to 10 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.