New projects near Lembah Subang LRT station

3 projects are selling or upcoming within 1.5 km of Lembah Subang, from RM270k. The cheapest unit at a project here has a median of RM582k, against RM723k along the LRT Kelana Jaya line.

Lembah Subang is stop 25 of 37 on the LRT Kelana Jaya line, open since 2016, with platforms above the road.

The 3 projects within 1.5 km sit in Petaling Jaya, listing from RM270k to RM1.11m. Completion runs from 2029 to 2030.

3 buildings have already been completed within 1.5 km, between 2023 and 2024. They are not for sale, and sit with the sold-out projects below.

The closest is Arra Residences (Phase 3), about 900 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

6 sold out, completed or lapsed within 1.5 km

Lembah Subang station

Station code
KJ25
Service
LRT
Opened
2016
Operator
Rapid KL
Platforms
elevated
Step-free access
Yes
Air-conditioned
Yes

Along the line

  • LRT Kelana Jaya line: Kelana Jaya ← Lembah Subang → Ara Damansara · trains 06:00 to 23:15, every 4 to 7 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.