New projects near Kuang KTM Komuter station
1 project is selling or upcoming within 1.5 km of Kuang, from RM589k. The cheapest unit at a project here has a median of RM589k, against RM699k along the KTM Port Klang line.
Kuang is stop 28 of 34 on the KTM Port Klang line, open since 1892. It is mapped as step-free.
The project within 1.5 km sits in Sungai Buloh, listing from RM589k to RM1.4m. Completion runs to 2027.
1 building has already been completed within 1.5 km in 2022. They are not for sale, and sit with the sold-out projects below.
The closest is E Park Residence (Phase 2), about 1.1 km away in a straight line. A walking route will be longer.
Selling within 1.5 km
1 sold out, completed or lapsed within 1.5 km
Kuang station
- Station code
- KA09
- Service
- KTM Komuter
- Opened
- 1892
- Operator
- KTM
- Step-free access
- Yes
- First and last train
- 06:01 to 23:49
Along the line
- KTM Port Klang line: Sungai Buloh ← Kuang → Rawang
Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.

