New projects near Kuala Kubu Bharu KTM Komuter station
1 project is selling or upcoming within 1.5 km of Kuala Kubu Bharu, from RM590k. The cheapest unit at a project here has a median of RM590k, against RM699k along the KTM Port Klang line.
Kuala Kubu Bharu is stop 33 of 34 on the KTM Port Klang line, open since 1894, with platforms above the road. It is mapped as step-free.
The project within 1.5 km sits in Kuala Kubu Bharu, listing from RM590k to RM663k. All of them are landed. Completion runs to 2026.
The closest is Laman Lentera, Kuala Kubu Bharu (Phase 2), about 500 m away in a straight line. A walking route will be longer.
Selling within 1.5 km
Kuala Kubu Bharu station
- Station code
- KA14
- Service
- KTM Komuter
- Opened
- 1894
- Operator
- KTM
- Platforms
- elevated
- Step-free access
- Yes
- First and last train
- 08:02 to 00:22
Along the line
- KTM Port Klang line: Rasa ← Kuala Kubu Bharu → Tanjung Malim
Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.
