New projects near Kota Damansara MRT station

3 projects are selling or upcoming within 1.5 km of Kota Damansara, from RM1.56m. The cheapest unit at a project here has a median of RM2.8m, against RM861k along the MRT Kajang line.

Kota Damansara is stop 3 of 29 on the MRT Kajang line, open since 2016, with platforms above the road. It is mapped as step-free.

The 3 projects within 1.5 km sit in Petaling Jaya, listing from RM1.56m to RM5.09m. 1 is high-rise and 2 landed. Completion runs to 2030.

The closest is Zenia (Phase 1b), about 1.4 km away in a straight line. A walking route will be longer.

Selling within 1.5 km

Kota Damansara station

Station code
KG06
Service
MRT
Opened
2016
Operator
Rapid KL
Platforms
elevated
Step-free access
Yes
Mapped entrances
2

Parking and the full facilities list are published by the operator: the station’s own page. We link to those rather than repeat them.

Along the line

  • MRT Kajang line: Kwasa Sentral ← Kota Damansara → Surian · trains 06:00 to 00:00, every 6 to 10 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.