New projects near Kepong Baru MRT station

2 projects are selling or upcoming within 1.5 km of Kepong Baru, from RM200k. The cheapest unit at a project here has a median of RM402k, against RM669k along the MRT Putrajaya line.

Kepong Baru is stop 9 of 36 on the MRT Putrajaya line, open since 2022, with platforms above the road. It is mapped as step-free.

The 2 projects within 1.5 km sit in Kepong, listing from RM200k to RM664k. Completion runs from 2027 to 2029.

4 buildings have already been completed within 1.5 km, between 2022 and 2025. They are not for sale, and sit with the sold-out projects below.

The closest is Residensi Armani Kepong, about 400 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

6 sold out, completed or lapsed within 1.5 km

Kepong Baru station

Station code
PY10
Service
MRT
Opened
2022
Operator
Rapid KL
Platforms
elevated
Step-free access
Yes
Mapped entrances
3

Along the line

  • MRT Putrajaya line: Metro Prima ← Kepong Baru → Jinjang · trains 06:00 to 00:00, every 4 to 14 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.