New projects near Batu Tiga KTM Komuter station

7 projects are selling or upcoming within 1.5 km of Batu Tiga, from RM250k. The cheapest unit at a project here has a median of RM506k, against RM699k along the KTM Port Klang line.

Batu Tiga is stop 10 of 34 on the KTM Port Klang line, open since 1995, with platforms above the road.

The 7 projects within 1.5 km sit in Shah Alam and Subang Jaya, listing from RM250k to RM1.28m. 6 are high-rise and 1 landed. Completion runs from 2027 to 2030.

1 building has already been completed within 1.5 km in 2025. They are not for sale, and sit with the sold-out projects below.

The closest is Taman D'Kayangan, Juvela (Phase 8), about 500 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

3 sold out, completed or lapsed within 1.5 km

Batu Tiga station

Station code
KD10
Service
KTM Komuter
Opened
1995
Operator
KTM
Platforms
elevated
Platform tracks
2
First and last train
06:34 to 22:46

Along the line

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.