New projects near Bandar Bukit Tinggi LRT station

4 projects are selling or upcoming within 1.5 km of Bandar Bukit Tinggi, from RM270k. The cheapest unit at a project here has a median of RM270k, against RM506k along the LRT Shah Alam line.

Bandar Bukit Tinggi is stop 2 of 20 on the LRT Shah Alam line, open since 2026, with platforms above the road. It is mapped as step-free.

The 4 projects within 1.5 km sit in Klang, listing from RM270k to RM934k. Completion runs from 2027 to 2030.

2 buildings have already been completed within 1.5 km, between 2023 and 2025. They are not for sale, and sit with the sold-out projects below.

The closest is Ambang Residensi, about 400 m away in a straight line. A walking route will be longer.

Selling within 1.5 km

2 sold out, completed or lapsed within 1.5 km

Bandar Bukit Tinggi station

Station code
SA24
Service
LRT
Opened
2026
Platforms
elevated
Step-free access
Yes
Mapped entrances
2

Along the line

  • LRT Shah Alam line: Johan Setia ← Bandar Bukit Tinggi → Klang Jaya · trains 06:00 to 00:00, every 8 to 10 minutes on a weekday

Stations and entrances from © OpenStreetMap contributors, with the opening year and platform count from Wikidata and the timetable from data.gov.my (CC BY 4.0). Distances are straight line from each listing’s map position, so the walk is longer. Sold out, completed and lapsed projects sit behind the toggle, none of them for sale. Prices are gross list prices.