All projectsUnits available

Tinta Residensi (Phase 3)

Gadong, Negeri Sembilanby Dynamic Age Construction Sdn Bhd

Condominium or apartment in Gadong, Negeri Sembilan

  • 140Units
  • 3Bedrooms
  • 930 to 1,000Sq ft
  • 2027Ready

Units available

53 of 140 units still available.

Licensed project

Sales permit 19845-4/02-2027/0152(N)-(S)

Key dates

Launched (first sale signed)
7 Mar 2024
Sales permit issued
19 Feb 2024
Handover promised in SPA
7 Mar 2027

Why consider Tinta Residensi (Phase 3)

  • Freehold tenure
  • Seven storeys with 140 units in total
  • Layouts of 930 sq ft and 1,000 sq ft, each with 3 bedrooms
  • Expected completion in 2027

About this property

Seven-storey apartment block in Gadong, Negeri Sembilan, with 140 units

Tinta Residensi (Phase 3) is a seven-storey apartment development in Gadong, Negeri Sembilan. The land is freehold.

The project is built by Dynamic Age Construction Sdn Bhd and has 140 units. Two layout types are offered, measuring 930 sq ft and 1,000 sq ft, each with 3 bedrooms. Completion is expected in 2027.

Unit types

RM343k to RM468k across all types

  • 3 bed
  • 930 sq ft

Floor plan not available yet

Ask for the floor plan

Prices by unit position

A position is the last part of the unit number (A-xx-05) and is usually the same layout on every floor. Higher floors cost more.

PositionFloorsUnits leftList price
C-xx-11 to 73 of 7RM360k to RM390k
C-xx-101 to 76 of 7RM432k to RM468k
C-xx-111 to 72 of 7RM360k to RM390k
C-xx-121 to 70 of 7RM340k to RM370k
C-xx-131 to 75 of 7RM340k to RM347k
C-xx-141 to 74 of 7RM340k to RM347k
C-xx-151 to 74 of 7RM340k to RM347k
C-xx-161 to 73 of 7RM340k to RM347k
C-xx-171 to 73 of 7RM340k to RM347k
C-xx-181 to 73 of 7RM340k to RM347k
C-xx-191 to 70 of 7RM340k to RM370k
C-xx-21 to 71 of 7RM340k to RM370k
C-xx-201 to 73 of 7RM360k to RM390k
C-xx-31 to 72 of 7RM340k to RM347k
C-xx-41 to 73 of 7RM340k to RM347k
C-xx-51 to 73 of 7RM340k to RM347k
C-xx-61 to 73 of 7RM340k to RM347k
C-xx-71 to 72 of 7RM340k to RM347k
C-xx-81 to 73 of 7RM340k to RM347k
C-xx-91 to 70 of 7RM340k to RM370k

Project records

Developer
Dynamic Age Construction Sdn Bhd
Status
Completed (CCC)
Construction progress
100%
Sales permit
19845-4/02-2027/0152(N)-(S)

Updated 26 Oct 2026.

RM343k to RM468kTinta Residensi (Phase 3)

Nearby projects

Within 3 km