Taman Saujana Permai
Taiping, Perakby Paku Rimba SdnBhd.
Terrace house, Townhouse in Taiping, Perak
- 486Units
- 1 to 2Storeys
- 700 to 904Sq ft
- 2015Ready
Units available
432 of 486 units still available.
Licensed project
Sales permit 4690-4/09-2024/0449(R)-(S)
Key dates
- Launched (first sale signed)
- 11 Jun 2012
- Sales permit issued
- 11 Sept 2018
- Handover promised in SPA
- 11 Jun 2015
Unit types
Terrace house
797 sq ft · 1 storeys
RM76k to RM129k
23 units
Townhouse
2 storeys
RM35k to RM110k
174 units
Townhouse
700 sq ft · 2 storeys
RM35k to RM54k
84 units
Terrace house
904 sq ft · 1 storeys
RM116k to RM238k
39 units
Terrace house
904 sq ft · 1 storeys
RM116k to RM173k
23 units
Terrace house
904 sq ft · 1 storeys
RM116k to RM185k
23 units
Terrace house
797 to 904 sq ft · 1 storeys
RM186k to RM329k
120 units
Price check
Listed at about RM128 per sq ft, 58% below the median of RM305 psf for 8 terrace, townhouse and cluster homes of a similar size launched since 2021 in Taiping.
See the nearby launches. This compares listed prices; it is not a valuation.
Prices by unit position
A position is the last part of the unit number (A-xx-05) and is usually the same layout on every floor. Higher floors cost more.
| Position | Floors | Units left | List price |
|---|---|---|---|
| A-xx-1 | 1 to 87 | 87 of 87 | RM35k to RM110k |
| A-xx-2 | 1 to 87 | 87 of 87 | RM35k |
Project records
- Developer
- Paku Rimba SdnBhd.
- Status
- Construction not started
- Construction progress
- 100%
- Sales permit
- 4690-4/09-2024/0449(R)-(S)
Updated 24 Oct 2026.
Nearby projects
Within 3 km
Loft Saujana
Taiping, Perak
Condominium or apartment · 2 to 3 beds · Ready 2024
RM255k to RM548k
9 of 136 units left
Launched 20 Jan 2021
Taman Asam Kumbang Ria (Phase 1)
Taiping, Perak
Terrace house, Semi-detached · 3 to 4 beds · Ready 2028
RM180k to RM998k
77 of 85 units left
Taman Puncak Taiping
Taiping, Perak
Terrace house · 4 bed
RM688k to RM708k
12 of 14 units left
Taman Puncak Taiping (Phase 4)
Taiping, Perak
Terrace house, Semi-detached · 4 to 5 beds · Ready 2025
RM508k to RM818k
24 of 46 units left
Launched 15 Dec 2023