All projectsUnits available

Suria Paragon (Phase 1)

Johor Bahru, Johorby Paragon Premium Sdn Bhd

Suria Paragon (Phase 1)

Serviced residence in Johor Bahru, Johor

  • 1,398Units
  • 1 to 3Bedrooms
  • 1 to 3Bathrooms
  • 499 to 1,177Sq ft
  • 2027Ready

Units available

127 of 1,398 units still available.

Licensed project

Sales permit 30435-1/10-2027/0749(R)-(S)

Key dates

Launched (first sale signed)
1 Nov 2023
Sales permit issued
5 Oct 2026
Handover promised in SPA
1 Nov 2026
Handover after approved extension
1 Nov 2027 (extended by 12 months)

Location

Why consider Suria Paragon (Phase 1)

  • Freehold land title
  • Development of 1398 units
  • Located beside the Johor Bahru to Singapore Rapid Transit System construction project
  • Five layout types from 499 to 1177 sq ft with one to three bedrooms
  • Gym and swimming pool among the facilities

About this property

Serviced residence in Johor Bahru, Johor, with 1398 units

Suria Paragon (Phase 1) is a serviced residence in Johor Bahru, Johor, developed by Paragon Premium Sdn Bhd. The development is beside the Johor Bahru to Singapore Rapid Transit System project that is under construction.

The development has 1398 units across five layout types, ranging from 499 to 1177 sq ft with one to three bedrooms. Completion is scheduled for 2027.

Facilities include a gym, a swimming pool and a lounge area.

Unit types

RM496k to RM1.01m across all types

  • 1 bed
  • 1 bath
  • 499 sq ft
Type A floor plan, Suria Paragon (Phase 1)

Price check

Listed at about RM995 per sq ft (estimate), 6% above the median of RM935 psf for 44 condos and serviced residences of a similar size launched since 2021 in Johor Bahru.

Estimate: this project's unit sizes come from its sales kit and are not yet matched to unit prices, so its cheapest list price is paired with the smallest layout and its dearest with the largest.

See the nearby launches. This compares listed prices; it is not a valuation.

Common facilities

Facilities

  • Gym
  • Swimming pool
  • Lounge area

Prices by unit position

A position is the last part of the unit number (A-xx-05) and is usually the same layout on every floor. Higher floors cost more.

PositionFloorsUnits leftList price
A-xx-0111 to 452 of 35RM411k to RM505k
A-xx-0211 to 450 of 35RM410k to RM503k
A-xx-0311 to 455 of 35RM626k to RM735k
A-xx-0411 to 458 of 35RM624k to RM733k
A-xx-0511 to 453 of 35RM726k to RM852k
A-xx-0611 to 450 of 35RM908k to RM1.05m
A-xx-0711 to 452 of 35RM725k to RM847k
A-xx-0811 to 451 of 35RM623k to RM736k
A-xx-0911 to 451 of 35RM513k to RM610k
A-xx-1011 to 451 of 35RM514k to RM619k
A-xx-1111 to 453 of 35RM515k to RM613k
A-xx-1211 to 455 of 35RM513k to RM643k
A-xx-1311 to 450 of 35RM624k to RM743k
A-xx-1411 to 454 of 35RM725k to RM1.02m
A-xx-1511 to 454 of 35RM820k to RM1.04m
A-xx-1611 to 452 of 35RM643k to RM848k
A-xx-1711 to 455 of 35RM626k to RM740k
A-xx-1811 to 453 of 35RM430k to RM740k
A-xx-1911 to 452 of 35RM410k to RM505k
A-xx-2011 to 451 of 34RM411k to RM503k
B-xx-0111 to 452 of 35RM411k to RM503k
B-xx-0211 to 451 of 35RM410k to RM505k
B-xx-0311 to 455 of 35RM624k to RM740k
B-xx-0411 to 457 of 35RM626k to RM735k
B-xx-0511 to 451 of 35RM726k to RM848k
B-xx-0611 to 450 of 35RM908k to RM1.04m
B-xx-0711 to 454 of 35RM724k to RM838k
B-xx-0811 to 452 of 35RM623k to RM736k
B-xx-0911 to 459 of 35RM512k to RM617k
B-xx-1011 to 456 of 35RM515k to RM613k
B-xx-1111 to 459 of 35RM514k to RM619k
B-xx-1211 to 455 of 35RM514k to RM707k
B-xx-1311 to 451 of 35RM624k to RM818k
B-xx-1411 to 4510 of 35RM726k to RM929k
B-xx-1511 to 450 of 35RM745k to RM1.05m
B-xx-1611 to 452 of 35RM643k to RM852k
B-xx-1711 to 455 of 35RM624k to RM733k
B-xx-1811 to 453 of 35RM430k to RM735k
B-xx-1911 to 451 of 35RM410k to RM503k
B-xx-2011 to 452 of 34RM411k to RM505k

Project records

Developer
Paragon Premium Sdn Bhd
Status
Under construction
Construction progress
65%
Sales permit
30435-1/10-2027/0749(R)-(S)
Bumiputera quota
40%

Updated 1 Nov 2026.

RM496k to RM1.01mSuria Paragon (Phase 1)

More from Paragon Premium Sdn Bhd

1 other project for sale or launching soon

See all

Nearby projects

Within 3 km