Pangsapuri Wawari Perdana
Iskandar Puteri, Johorby Marcus Property Sdn Bhd
Condominium or apartment in Iskandar Puteri, Johor
- 1,032Units
- 3Bedrooms
- 3Bathrooms
- 1,000 to 1,208Sq ft
- 2029Ready
2026 launches
Launched 18 Jul 2026. 902 of 1,032 units still available.
Licensed project
Sales permit 19869-6/06-2029/0447(A)-(S)
Key dates
- Launched (first sale signed)
- 18 Jul 2026
- Sales permit issued
- 18 Jun 2026
- Handover promised in SPA
- 18 Jul 2029
Location
- Marborough College Malaysia 0.17KM
- Raffles American School 1.2KM
- Educity Hub 6KM
- Educity Sports Complex 6KM
- Legoland Malaysia 6.7KM
- Gleneagles Hospital Medini 7.4KM
- Mall of Medini 7.3KM
- AEON Mall Bukit Indah 8.8KM
- Lotus's Bukit Indah 9.5KM
- Columbia Asia Hospital 11KM
- Puteri Harbour International Ferry Terminal 11KM
- Tuas Checkpoint 21KM
Why consider Pangsapuri Wawari Perdana
- Freehold tenure
- Level 4 facilities floor with a swimming pool, jacuzzi, gym and sauna
- Marborough College Malaysia is 0.17KM away and Raffles American School is 1.2KM away
- Mall of Medini is 7.3KM away and Puteri Harbour International Ferry Terminal is 11KM away
About this property
Condominium with 1,032 units across two blocks in Iskandar Puteri, Johor
Pangsapuri Wawari Perdana, also known as Elmora Condominium, is a freehold condominium in Wawari Township, Iskandar Puteri, Johor. Marcus Property Sdn Bhd is the developer, and completion is expected in 2029.
The development has two blocks with 1,032 units in total. Three layouts are offered: Type A at 1,000 sq ft, and Type A1 and Type A2 at 1,208 sq ft each. All are three-bedroom units with three bathrooms, and Type A2 is an accessible unit.
Facilities are on Level 4 and include a swimming pool, a children's play area, a jogging trail, a basketball court, a pickleball court, a sauna and a fitness centre, along with party and family terraces.
Unit types
RM674k to RM784k across all types
- 3 bed
- 3 bath
- 1,000 sq ft
Price check
Listed at about RM674 per sq ft (estimate), about the same as the median of RM656 psf for 7 condos and serviced residences of a similar size launched since 2021 in Iskandar Puteri.
Estimate: this project's unit sizes come from its sales kit and are not yet matched to unit prices, so its cheapest list price is paired with the smallest layout and its dearest with the largest.
See the nearby launches. This compares listed prices; it is not a valuation.
Common facilities
Level 4
- Swimming pool
- Kids wading pool
- Shallow pool
- Jacuzzi
- Aroma garden
- Herb garden
- Kids playground
- Pickleball court
- Kids adventure zone
- Camping area
- Jogging trail
- Basketball court
- Multi-purpose room
- Management office
- Meeting room
- Surau
- Changing room and toilets
- Sauna
- Games room
- Fitness centre
- Outdoor fitness equipment
- Children playroom
- Gourmet kitchen and party lounge
- BBQ area
- Party terrace
- Family terrace
- Event terrace
- Pavilion
- Sunshine pool deck
Project records
- Developer
- Marcus Property Sdn Bhd
- Status
- Under construction
- Construction progress
- 5%
- Sales permit
- 19869-6/06-2029/0447(A)-(S)
Updated 5 Nov 2026.
More from Marcus Property Sdn Bhd
3 other projects for sale or launching soon
Taman Rimba Indah
Pontian, Johor
Terrace house · 3 to 4 beds
RM80k to RM560k
14 of 90 units left
Selayang Mutiara Residensi
Selayang, Selangor
Condominium or apartment · 3 bed · Ready 2028
RM577k to RM601k
167 of 260 units left
Launched 1 Feb 2025
Taman Rimba Indah
Pontian, Johor
Cluster house, Semi-detached · 3 bed · Ready 2024
RM597k to RM713k
2 of 88 units left
Launched 17 Jan 2022
Nearby projects
Within 3 km
Residensi Sari Hijau Ii
Iskandar Puteri, Johor
Terrace house · 4 bed · Ready 2029
RM1.12m to RM1.34m
17 of 120 units left
Residensi Sari Hijau I
Iskandar Puteri, Johor
Terrace house · 4 bed · Ready 2029
RM1.16m to RM2.11m
63 of 328 units left
Taman Bukit Suria
Iskandar Puteri, Johor
Bungalow · 4 to 5 beds · Ready 2027
RM2.81m to RM4.1m
20 of 61 units left
Launched 1 Aug 2024
Residensi Rimba
Iskandar Puteri, Johor
Townhouse · 3 bed · Ready 2028
From RM488k
1 of 250 units left
Launched 22 Nov 2025






