All projectsUnits available

Pangsapuri Seri Juru Indah (Phase 3)

Bukit Minyak, Seberang Perai Tengah, Penangby World Corporate Construction Sdn Bhd

Pangsapuri Seri Juru Indah (Phase 3)

Condominium or apartment in Seberang Perai Tengah, Penang

  • 148Units
  • 3Bedrooms
  • 2Bathrooms
  • 950 to 1,050Sq ft
  • 2028Ready

Units available

118 of 148 units still available.

Licensed project

Sales permit 30807-1/06-2028/0459(N)-(S)

Key dates

Launched (first sale signed)
17 Jul 2025
Sales permit issued
11 Jun 2025
Handover promised in SPA
17 Jul 2028

Location

Why consider Pangsapuri Seri Juru Indah (Phase 3)

  • Freehold title (Hakmilik Kekal) for the land
  • 148 units in a 23-storey block
  • Three layouts of 950 to 1050 sq ft built-up, all with three bedrooms
  • Sited at Juru Interchange in Prai, Penang, with road links to the Penang Bridge and Penang Second Link

About this property

23-storey apartment project with 148 units at Juru Interchange, Prai, Penang

Pangsapuri Seri Juru Indah is a 23-storey apartment project at Juru Interchange in Prai, Seberang Perai Tengah, Penang. World Corporate Construction Sdn Bhd is the developer, and the project is the third phase. Expected completion is in 2028.

The project has 148 units in three layouts. Built-up sizes range from 950 to 1050 sq ft, and every layout has three bedrooms.

The land is freehold. Recreation facilities are part of the development.

Unit types

RM462,000 to RM512,000

  • 3 bed
  • 2 bath
  • 950 sq ft
  • From RM486 psf

74 of 88 units left. List prices rise with the floor.

Type A/A1 floor plan, Pangsapuri Seri Juru Indah (Phase 3)

Price check

Listed at about RM501 per sq ft, about the same as the median of RM475 psf for 7 condos and serviced residences of a similar size launched since 2021 in Seberang Perai Tengah.

See the nearby launches. This compares listed prices; it is not a valuation.

Project records

Developer
World Corporate Construction Sdn Bhd
Status
Under construction
Construction progress
63%
Sales permit
30807-1/06-2028/0459(N)-(S)
Bumiputera quota
30%

Updated 1 Nov 2026.

RM462k to RM554kPangsapuri Seri Juru Indah (Phase 3)

Nearby projects

Within 3 km