All projects2026 launches

Kota Seribong @ Bandar Baru Tunjong (Phase 1 (4B))

Kampung Padang Enggang, Kelantanby Sensatimur Sdn Bhd

Kota Seribong @ Bandar Baru Tunjong (Phase 1 (4B))

Terrace house in Kampung Padang Enggang, Kelantan

  • 132Units
  • 0Bedrooms
  • 974 to 1,006Sq ft
  • 2028Ready

2026 launches

Launched 17 May 2026. 26 of 132 units still available.

Licensed project

Sales permit 11296-10/04-2027/0320(A)-(L)

Key dates

Launched (first sale signed)
17 May 2026
Sales permit issued
24 Apr 2025
Handover promised in SPA
17 May 2028

Location

  • RTC within 1 km
  • Giant within 1 km
  • Mydin within 1 km
  • G-Orange Mall within 1 km
  • Pasar Wakaf Che Yeh within 2 km
  • RTM Kelantan within 2 km
  • Autocity within 2 km
  • CIMB Bank within 2 km

Why consider Kota Seribong @ Bandar Baru Tunjong (Phase 1 (4B))

  • RTC, Giant, Mydin and G-Orange Mall are within 1 km
  • Pasar Wakaf Che Yeh, RTM Kelantan, Autocity and CIMB Bank are within 2 km
  • Each single-storey terrace unit has three bedrooms
  • Leasehold (96 years) land tenure

About this property

Single-storey terrace houses in Phase 1 (4B) of Kota Seribong @ Bandar Baru Tunjong

Kota Seribong @ Bandar Baru Tunjong Phase 1 (4B) is a terrace house development in Kampung Padang Enggang, Kelantan. The houses are single-storey terrace homes held on Leasehold (96 years) tenure.

Sensatimur Sdn Bhd is the developer. The phase has 132 units across three layouts: Intermediate, Corner Lot and End Lot, each on a 20 x 65 lot. Built-up sizes range from 974 sq ft to 1006 sq ft, and each layout has three bedrooms.

Unit types

RM357k to RM535k across all types

  • Suite
  • 974 sq ft

Floor plan not available yet

Price check

Listed at about RM470 per sq ft, the highest of 9 terrace, townhouse and cluster homes of a similar size launched since 2021 within 10 km; the next highest lists at RM410 psf and the median at RM290 psf.

See the nearby launches. This compares listed prices; it is not a valuation.

Project records

Developer
Sensatimur Sdn Bhd
Status
Under construction
Construction progress
45%
Sales permit
11296-10/04-2027/0320(A)-(L)

Updated 5 Nov 2026.

RM357k to RM535kKota Seribong @ Bandar Baru Tunjong (Phase 1 (4B))

More from Sensatimur Sdn Bhd

3 other projects for sale or launching soon

See all

Nearby projects

Within 3 km