All projectsUnits available

Desa Budiman (Phase 8)

Bandar Sungai Long, Kajang, Selangorby Pujangga Development Sdn Bhd

Desa Budiman (Phase 8)

Terrace house in Kajang, Selangor

  • 44Units
  • 4Bedrooms
  • 3Bathrooms
  • 1,794 to 2,035Sq ft
  • 2026Ready

Units available

19 of 44 units still available.

Licensed project

Sales permit 11162-6/04-2027/0237(R)-(L)

Key dates

Launched (first sale signed)
28 Aug 2024
Sales permit issued
23 Apr 2026
Handover promised in SPA
28 Aug 2026

Location

Why consider Desa Budiman (Phase 8)

  • 44 two-storey terrace houses across six blocks inside a gated compound
  • Three layouts, all with four bedrooms, with built-up sizes from 1,794 to 2,035 sq ft
  • Solar-powered hot water system and air-conditioning piping included
  • Located in the Bandar Sungai Long township in Kajang, Selangor

About this property

Two-storey terrace houses in Bandar Sungai Long, Kajang, Selangor

Desa Budiman Phase 8 is a development of 44 two-storey terrace houses inside a gated compound in Bandar Sungai Long, Kajang, Selangor. It is one of the Desa Budiman projects and is expected to be completed in 2026.

Pujangga Development Sdn Bhd is the developer. The 44 units are arranged in six blocks, labelled A to F. There are three layouts, from 20' x 60' to 20' x 80', with built-up sizes from 1,794 to 2,035 sq ft and four bedrooms in each.

Additional features include an air-conditioning piping system, a solar-powered hot water system and a water pump system.

Unit types

RM830k to RM1.15m across all types

  • 4 bed
  • 3 bath
  • 1,794 sq ft
Type 20' x 60' (RT1) floor plan, Desa Budiman (Phase 8)

Price check

Listed at about RM497 per sq ft, about the same as the median of RM491 psf for 12 terrace, townhouse and cluster homes of a similar size launched since 2021 in Kajang.

See the nearby launches. This compares listed prices; it is not a valuation.

Common facilities

Facilities

  • Air-conditioning piping
  • Solar-powered hot water
  • Water pump system

Project records

Developer
Pujangga Development Sdn Bhd
Status
Completed (CCC)
Construction progress
100%
Sales permit
11162-6/04-2027/0237(R)-(L)
Bumiputera quota
100%

Updated 1 Nov 2026.

RM830k to RM1.15mDesa Budiman (Phase 8)

More from Pujangga Development Sdn Bhd

1 other project for sale or launching soon

See all

Nearby projects

Within 3 km