All projects2026 launches

Azalea (Bandar Universiti Seri Iskandar) (Phase 2)

Perak Tengah, Perakby Agro-Mod Industries Sdn Bhd

Terrace house in Perak Tengah, Perak

  • 40Units
  • 4Bedrooms
  • 2Bathrooms
  • 1,388 to 1,537Sq ft
  • 2028Ready

2026 launches

Launched 20 May 2026. 18 of 40 units still available.

Licensed project

Sales permit 7937-28/03-2028/0194(A)-(L)

Key dates

Launched (first sale signed)
20 May 2026
Sales permit issued
10 Mar 2026
Handover promised in SPA
20 May 2028

Why consider Azalea (Bandar Universiti Seri Iskandar) (Phase 2)

  • Forty units in the development
  • Leasehold tenure of 99 years
  • Built-up area of 1,388 to 1,537 sq ft across three layouts, all with four bedrooms
  • Fibre optic internet connection available
  • Extended kitchen space in each unit

About this property

One-and-a-half-storey terrace houses in Bandar Universiti Seri Iskandar, Perak Tengah

Azalea Phase 2 is a development of 40 one-and-a-half-storey terrace houses in Bandar Universiti Seri Iskandar, Perak Tengah, Perak. Each unit sits on a lot measuring 22 by 65 feet, and completion is expected in 2028.

The developer is Agro-Mod Industries Sdn Bhd. Built-up areas range from 1,388 to 1,537 sq ft across three layouts for corner, end and middle lots, each with four bedrooms.

Facilities include an extended kitchen, a car porch and a fibre optic internet connection. The development is surrounded by local amenities, education and healthcare facilities.

Unit types

RM398k to RM436k across all types

  • 4 bed
  • 2 bath
  • 1,537 sq ft

Floor plan not available yet

Price check

Listed at about RM322 per sq ft, the highest of 5 terrace, townhouse and cluster homes of a similar size launched since 2021 in Perak Tengah; the next highest lists at RM253 psf and the median at RM177 psf.

See the nearby launches. This compares listed prices; it is not a valuation.

Common facilities

Facilities

  • Extended kitchen
  • Car porch
  • Fibre optic internet connection
  • Green space

Project records

Developer
Agro-Mod Industries Sdn Bhd
Status
Under construction
Construction progress
11%
Sales permit
7937-28/03-2028/0194(A)-(L)

Updated 6 Nov 2026.

RM398k to RM436kAzalea (Bandar Universiti Seri Iskandar) (Phase 2)

More from Agro-Mod Industries Sdn Bhd

2 other projects for sale or launching soon

See all

Nearby projects

Within 3 km